Model: | GW5 | Frequency: | 50/60Hz |
---|---|---|---|
Poles Number: | 3 | Material: | Galvanized Sheet And Accessories |
Certificate: | ISO CCC | Standard: | GB, IEC Standard |
Function: | Break Or Switch The Line. | Installation Location: | Power Plants, Substations And Power Systems Etc |
Warranty: | 12 Months | ||
High Light: | Gw5-40.5 High Voltage Disconnect Switch,V Type High Voltage Disconnect Switch,Gw5-40.5 power isolation switch |
Gw5-40.5 Substation High Voltage Vtype Porcelain Disconnect Switch Isolation Switch
Techncial data
Type | Rated voltage(kV) | Rated current (A) |
Limit passing current(kA) | 10s thermal stability current(kA) | |
Peak | Effective value | ||||
(H)GW5-12G/200A | 12 | 200 | 5 | 9 | 5 |
(H)GW5-12G/400A | 12 | 400 | 21 | 15 | 10 |
(H)GW5-12G/630A | 12 | 630 | 35 | 25 | 14 |
(H)GW5-12G/800A | 12 | 800 | 55 | 35 | 20 |
(H)GW5-12G/1000A | 12 | 1000 | 80 | 45 | 28 |
(H)GW5-12G/1250A | 12 | 1250 | 120 | 55 | 39 |
(H)GW5-10/200A | 12 | 200 | 5 | 9 | 5 |
(H)GW5-10/400A | 12 | 400 | 21 | 15 | 10 |
(H)GW5-10/630A | 12 | 630 | 35 | 25 | 14 |
(H)GW5-10/800A | 12 | 800 | 55 | 35 | 20 |
(H)GW5-10/1000A | 12 | 1000 | 80 | 45 | 28 |
(H)GW5-10/1250A | 12 | 1250 | 120 | 55 | 39 |
Service:
1.XIGAO Electricenergy Group Co., Ltd is founded in 1993, 320000m2 plant, specialized in manufacturing high & low voltage power transmission and distribution (PTD) equipment, always focusing on the business at collection of research, design, OEM, ODM and trade in CN.
2. Our factory has Automantic production line.
3. We have quality management system and relevant certificates.
4. 24 hours oversea service online.
Competitive Advantages
1. We offer high quality products at competitive price.
2. Shortest delivery time.
3. Flexible payment terms.
4. Timely after-sale service.
5. Our products have been exported to Argentina, Egypt, Australia, Romania, Pakistan, Dubai, Abu Dhabi, Iran, India, Indonesia, Vietnam, Malaysia and many other countries.
Product photo:
FAQ:
1. Send the technical data, better for all useful information; we will make a good recommendation.
If possible please attach one reference picture to avoid any misunderstanding or any links from our website for we get a better understanding.
2. The lead time depend on quantity of order. Some standard type is on stock. Otherwise, it will take 3-15 days.
3. Usually shipped by sea, small order or urgent order we can send you by air.
4. All our activities are accredited to ISO 14001:2015 and IEC standard.
5. Technology ensure the quality satisfy international request.